
Bishop Hooper Primary School

Bishop Hooper Primary School was created by the amalgamation of Caynham Primary School and Ashford Carbonell Primary School in 2009. The project brief was for a four class primary school for a potential 120 pupils and a nursery to accommodate 30 pupils. The new school replaced the existing school and nursery facilities in Caynham, which did not provide sufficient space for the school.
Location
Shropshire, UK
Area
925 m2
Status
Completed
Year
2011
Client
Shropshire County Council

The layout of the building was driven by a desire to develop the spatial requirements of the school’s brief with a single building section that would run the length of the plan.
All arranged on a single storey, the plan is simple and easily navigated with distinct zones for the entrance, Key Stage 1 & 2, Early Years & Foundation, staff & administration and community use.
Orientated on an east-west axis, the rectilinear plan can be split into three strips with all classroom and teaching space to the South, circulation and interactive hub spaces within the centre and all staff and administration facilities located to the North.
The well laid out plan and simple section created a building solution that met the internal environmental requirements of fresh air, adequate daylight and solar gain, whilst maintaining security, a relationship with the external landscape and an aesthetic of architectural merit.
There is a lovely feel to the place and we have had some lovely moments already such as the sun shining through the coloured glass panels and making beautiful patterns on the wall while we were singing in assembly.
Kerri Phelps, Head Teacher
Vision

Add paragraph text. Click “Edit Text” to update the font, size and more. To change and reuse text themes, go to Site Styles.
Add a Title
Add a Title

Add paragraph text. Click “Edit Text” to update the font, size and more. To change and reuse text themes, go to Site Styles.

Add paragraph text. Click “Edit Text” to update the font, size and more. To change and reuse text themes, go to Site Styles.
Add a Title
Add a Title

Add paragraph text. Click “Edit Text” to update the font, size and more. To change and reuse text themes, go to Site Styles.
Design
The building has been designed to sit as low as possible within the landscape, to minimise its presence and correlate with the existing surrounding agricultural architecture. Incorporating a lightweight, low maintenance sedum roof, whose natural colours change with each season, has allowed the building to naturally blend into the landscape.
Glazing is used to form the architectural expression. The south façade is predominantly glazed, reflecting the sky and surrounding landscape. The visual transparency helps individuals to orientate themselves through the circulation zone (hub spaces) whilst maintaining a reference with the external landscape. The inclusion of stained glass windows at strategic points throughout the building provides a subtle reference to its denomination as a Church of England School.
The school is wonderful - we can't believe how much space we have both inside and out. The children already seem more creative and have approached me to set up a school magazine, with another group wanting to perform in the hall.














2%20(1).jpg)




















